|
Target Name
|
Target Station
|
Target Module
|
HP/LP
|
Ion Source
|
Note
|
Start Date
|
End Date
|
Schedule Link
|
DocuShare
|
|---|---|---|---|---|---|---|---|---|---|
| ZrC#8 | ITE | TM2 | LP | SIS | 2019-8-20 | 2019-9-17 | 136 | Collection-24572 |
Target Details
|
|||
|---|---|---|---|
| Installed Date | 2019-8-15 | Planned Start Date | 2019-08-27 |
| Heaters/ ECR On | 2019-8-17 | Weight [kg] | |
| Target Material [g] | Backing Material [g] | ||
| Removed | 2019-9-30 | Shipping Date | |
Proton Beam
|
|||
| Impedance [mΩ] | 19.44 | BIAS [kV] | 25 |
| Rated p+ [μA] | 55 | Peak p+ [μA] | 70 |
| Net Charge [μAh] | 28196.73 | Est p+ Charge | |
Assays
|
|||
| Assay 1 [μSv/h] @1m | 205000 | Assay 1 Date | 2019-10-2 |
| Assay 2 [μSv/h] @1m | 2019-12-10 | Assay 2 Date | 74800 |
| Assay 3 [μSv/h] @1m | Assay 3 Date | ||
| Assay 4 [μSv/h] @1m | Assay 4 Date | ||
| Assay 5 [μSv/h] @1m | Assay 5 Date | ||
| Dose rate OC F-308 μSv/h [mSv/h] | Dose rate @1m F-308 μSv/h [mSv/h] | ||
| Date of Sent | Days to Ship | ||
| Calculated Ship Days | 1410 | Optimistic | 1015 |
| Schedule Start | 2019-8-27 | Schedule End | 2019-9-17 |
| Estimated Ship Days | 907 | Estimated Ship Years | 2.48547945205479 |
| Vault Location | 3A | Pail | 217 |
| Vault Comment | This pail also contains, wire, a wirescanner, IGM guage, target bolts and water block bolts | ||
| Target Assayed | Measured | ||