UC#29 ITW TM4 LP SIS 2019-10-30 2019-12-21 137 Collection-26479


Details

Target Details
Installed Date 2019-10-24 Planned Start Date 2019-10-30
Heaters/ ECR On 2019-10-29 Weight [kg]
Target Material [g] Backing Material [g]
Removed 2020-2-4 Shipping Date
Proton Beam
Impedance [mΩ] 13.85 BIAS [kV]
Rated p+ [μA] 20 Peak p+ [μA] 20
Net Charge [μAh] 11913 Est p+ Charge
Assays
Assay 1 [μSv/h] @1m 22400 Assay 1 Date 2020-2-7
Assay 2 [μSv/h] @1m Assay 2 Date
Assay 3 [μSv/h] @1m Assay 3 Date
Assay 4 [μSv/h] @1m Assay 4 Date
Assay 5 [μSv/h] @1m Assay 5 Date
Dose rate OC F-308 μSv/h [mSv/h] Dose rate @1m F-308 μSv/h [mSv/h]
Date of Sent Days to Ship
Calculated Ship Days 1382 Optimistic 905
Schedule Start 2019-10-30 Schedule End 2019-11-20
Estimated Ship Days 575 Estimated Ship Years 1.57413698630137
Vault Location 6A Pail 225