Canada's particle accelerator centre
Centre canadien d'accélération des particules

Target Summary Info

Target Name
Target Station
Target Module
HP/LP
Ion Source
Note
Start Date
End Date
Schedule Link
DocuShare
UC#25 ITW TM2 LP SIS 2018-11-21 2018-12-11 135 Collection-23480


Details

Target Details
Installed Date 2018-11-6 Planned Start Date 2018-11-07
Heaters/ ECR On 2018-11-8 Weight [kg]
Target Material [g] Backing Material [g]
Removed 2019-1-9 Shipping Date
Proton Beam
Impedance [mΩ] 13.3 BIAS [kV] 26
Rated p+ [μA] 10 Peak p+ [μA] 9.8
Net Charge [μAh] 3863.44 Est p+ Charge 8.623e+19
Assays
Assay 1 [μSv/h] @1m 12800 Assay 1 Date 2019-1-11
Assay 2 [μSv/h] @1m 2019-11-4 Assay 2 Date 1560
Assay 3 [μSv/h] @1m 2019-12-11 Assay 3 Date 1330
Assay 4 [μSv/h] @1m 2020-10-30 Assay 4 Date 529
Assay 5 [μSv/h] @1m Assay 5 Date
Dose rate OC F-308 μSv/h [mSv/h] Dose rate @1m F-308 μSv/h [mSv/h]
Date of Sent 2020-10-30 Days to Ship
Calculated Ship Days 448 Optimistic 294
Schedule Start 2018-11-7 Schedule End 2018-11-27
Estimated Ship Days 365 Estimated Ship Years 0.999452054794521
Vault Location Pail 244
Vault Comment This pail is one with the thicker steel. Pail changed from 204 to 244
Target Assayed Assayed