UC#23 ITW TM2 LP FEBIAD CTL 2018-8-23 2018-9-11 134 Collection-22550


Details

Target Details
Installed Date 2018-8-14 Planned Start Date 2018-08-22
Heaters/ ECR On 2018-8-16 Weight [kg]
Target Material [g] Backing Material [g]
Removed 2018-9-18 Shipping Date 2020-6-17
Proton Beam
Impedance [mΩ] 11.8 BIAS [kV] 20
Rated p+ [μA] 10 Peak p+ [μA] 9.8
Net Charge [μAh] 3999.46 Est p+ Charge 8.927e+19
Assays
Assay 1 [μSv/h] @1m 26700 Assay 1 Date 2018-9-25
Assay 2 [μSv/h] @1m 2019-11-1 Assay 2 Date 1070
Assay 3 [μSv/h] @1m Assay 3 Date
Assay 4 [μSv/h] @1m Assay 4 Date
Assay 5 [μSv/h] @1m Assay 5 Date
Dose rate OC F-308 μSv/h [mSv/h] Dose rate @1m F-308 μSv/h [mSv/h]
Date of Sent 2019-11-14 Days to Ship 645
Calculated Ship Days 464 Optimistic 304
Schedule Start 2018-8-21 Schedule End 2018-9-11
Estimated Ship Days 383 Estimated Ship Years 1.04942465753425
Vault Location Pail 222
Vault Comment Pail switched from 170 to 222
Target Assayed Assayed