SiC#35 ITW TM2 HP FEBIAD 2016-11-15 2016-11-22 131


Details

Target Details
Installed Date 2016-10-27 Planned Start Date 2016-10-25
Heaters/ ECR On 2016-11-2 Weight [kg]
Target Material [g] Backing Material [g]
Removed Shipping Date
Proton Beam
Impedance [mΩ] 12.2 BIAS [kV] 35
Rated p+ [μA] 65 Peak p+ [μA] 65
Net Charge [μAh] 16453.12 Est p+ Charge 3.670e+20
Assays
Assay 1 [μSv/h] @1m 228000 Assay 1 Date
Assay 2 [μSv/h] @1m 2017-3-20 Assay 2 Date 18500
Assay 3 [μSv/h] @1m Assay 3 Date
Assay 4 [μSv/h] @1m Assay 4 Date
Assay 5 [μSv/h] @1m Assay 5 Date
Dose rate OC F-308 μSv/h [mSv/h] Dose rate @1m F-308 μSv/h [mSv/h]
Date of Sent Days to Ship
Calculated Ship Days 823 Optimistic 790
Schedule Start 2016-10-25 Schedule End 2016-11-16
Estimated Ship Days 1521 Estimated Ship Years 4.2
Vault Location 7C Pail 144
Vault Comment
Target Assayed Measured